PanelCensus

SDGE-INT-57647

El Cajon · San Diego County · California · Commercial

System size
323.3 kW
323.3 kW AC
Installed
2014
2014-06-23
Price / watt
—
pre-incentive
Ownership
Host-owned

Parties

Who's involved

RoleName
DeveloperSwinerton BuildersAll their sites →
InstallerSwinerton BuildersAll their sites →
Utility / operatorSan Diego Gas & Electric Co.All their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
moduleBYD (Huizhou) BatteryBYD 255P6C-301,456221.8 W
inverterSMA AmericaSTP24000TL-US-10 (480V)624 kW
inverterAdvanced Energy IndustriesAE 260TX-4801—

Site risk

Severe-weather exposure

Solar sites in San Diego County have been matched to an average of 2 hail and 3 high-wind NOAA storm events.

Regional storm exposure by proximity (80,199 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Record cadg_SDGE-INT-57647 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

SDGE-INT-57647 — solar installation details | PanelCensus · PanelCensus