PanelCensus

SDGE-INT-444625

Encinitas · San Diego County · California · Commercial

System size
100.1 kW
96.5 kW AC
Installed
2024
2024-12-20
Price / watt
$3.57/W
pre-incentive
Ownership
—
not reported

Parties

Who's involved

RoleName
DeveloperBitterend Ventures Inc DBA BVI SOLARAll their sites →
InstallerBitterend Ventures Inc DBA BVI SOLARAll their sites →
UtilitySan Diego Gas & Electric Co.All their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
inverterEnphase Energy Inc.IQ7PLUS-72-x-US [240V]21—
inverterEnphaseEnergyInc.IQ8H-3P-72-E-US[208V]1700.38 kW
inverterEnphase EnergyM250-60-2LL-S2X (-ZC) (-NA) (208V)84—
inverterEnphase Energy Inc.IQ7PLUS-72-x-US [240V]21—
inverterEnphaseEnergyInc.IQ8H-3P-72-E-US[208V]1700.38 kW
inverterEnphase EnergyM250-60-2LL-S2X (-ZC) (-NA) (208V)84—

Site risk

Severe-weather exposure

Solar sites in San Diego County have been matched to an average of 2 hail and 3 high-wind NOAA storm events.

Regional storm exposure by proximity (80,199 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Record cadg_SDGE-INT-444625 from CADG · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

More solar data for this area

Working with California solar installation records? Pro adds alerts, change history and CSV export ($149/mo); Enterprise adds full national files, the API and an MCP server for AI tools.