SDGE-INT-414987
Chula Vista · San Diego County · California · Commercial
System size
87.9 kW
87.9 kW AC
Installed
2024
2024-03-19
Price / watt
$2.54/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | Warner Energy | All their sites → |
| Installer | Warner Energy | All their sites → |
| Utility / operator | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | SuzhouTalesunSolarTechnologiesCo.,Ltd. | TD6I72M-450 | 216 | 407.4 W |
| inverter | SMAAmerica | STP33-US-41[480V] | 1 | — |
| inverter | SMAAmerica | STP50-US-41[480V] | 1 | 50 kW |
Site risk
Severe-weather exposure
Solar sites in San Diego County have been matched to an average of 2 hail and 3 high-wind NOAA storm events.
Regional storm exposure by proximity (80,199 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_SDGE-INT-414987 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Need California solar installation records in bulk? Filtered CSV export from 5,000 rows per download on Pro ($19/mo); Enterprise up to 100,000 rows.