SDGE-INT-377232
San Diego County · California · Utility-scale
System size
1,482.4 kW
1,482.4 kW AC
Installed
2024
2024-05-13
Price / watt
—
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Installer | Self Installer | All their sites → |
| Utility / operator | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | TeslaInc. | 1462965-XX-Y[480V,4hr] | 34 | — |
| inverter | TeslaInc. | 1462965-XX-Y[480V,4hr] | 26 | — |
Site risk
Severe-weather exposure
Solar sites in San Diego County have been matched to an average of 2 hail and 3 high-wind NOAA storm events.
Regional storm exposure by proximity (80,199 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_SDGE-INT-377232 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.