PanelCensus

SDGE-INT-361133

Coronado · San Diego County · California · Utility-scale

System size
2,257.4 kW
2,158.2 kW AC
Installed
2023
2023-11-28
Price / watt
$0.12/W
pre-incentive
Ownership
Host-owned

Parties

Who's involved

RoleName
InstallerBaker Electric, IncAll their sites →
Utility / operatorSan Diego Gas & Electric Co.All their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
inverterSMAAmericaSTP50-US-41[480V]350 kW
inverterSolectria RenewablesSGI 300-4801—
inverterPV PoweredPVP260KW3—
inverterSolectria RenewablesSGI 300-4801—
inverterSatCon TechnologyPVS-75 (480 V)2—
inverterSMAAmericaSTP50-US-41[480V]350 kW
inverterSatCon TechnologyPVS-75 (480 V)2—
inverterSatCon TechnologyPVS-50 (240 V)1—
inverterSatCon TechnologyPVS-50 (240 V)1—
inverterPV PoweredPVP260KW3—

Site risk

Severe-weather exposure

Solar sites in San Diego County have been matched to an average of 2 hail and 3 high-wind NOAA storm events.

Regional storm exposure by proximity (80,199 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Record cadg_SDGE-INT-361133 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

SDGE-INT-361133 — solar installation details | PanelCensus · PanelCensus