SDGE-INT-337259
San Juan Capo · Orange County · California · Commercial
System size
74.3 kW
71.7 kW AC
Installed
2024
2024-09-06
Price / watt
$1.70/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | 1st Light Energy Inc | All their sites → |
| Installer | 1st Light Energy Inc | All their sites → |
| Utility / operator | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | HYUNDAIENERGYSOLUTIONSCO.,LTD. | HiA-S390HI | 204 | 362.7 W |
| inverter | ChintPowerSystemsAmerica | CPSSCA25KTL-DO/US-208[208V] | 2 | — |
Site risk
Severe-weather exposure
Solar sites in Orange County have been matched to an average of 0 hail and 1 high-wind NOAA storm events.
Regional storm exposure by proximity (417 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_SDGE-INT-337259 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Need California solar installation records in bulk? Filtered CSV export from 5,000 rows per download on Pro ($19/mo); Enterprise up to 100,000 rows.