SDGE-INT-200518
Chula Vista · San Diego County · California · Commercial
System size
225.1 kW
225.1 kW AC
Installed
2020
2020-05-05
Price / watt
$3.07/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | Precision Electric | All their sites → |
| Installer | Precision Electric | All their sites → |
| Utility / operator | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | HYUNDAI ENERGY SOLUTIONS CO., LTD. | HIS-S360KI | 704 | 359.7 W |
| inverter | SMA America | STP 50-US-41 [480V] | 3 | — |
| inverter | SMA America | STP30000TL-US-10 [480V] | 3 | 30 kW |
Site risk
Severe-weather exposure
Solar sites in San Diego County have been matched to an average of 2 hail and 3 high-wind NOAA storm events.
Regional storm exposure by proximity (80,199 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_SDGE-INT-200518 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Need California solar installation records in bulk? Filtered CSV export from 5,000 rows per download on Pro ($19/mo); Enterprise up to 100,000 rows.