SCE-INT-SCE-68581
Orange County · California · Commercial
System size
252 kW
217.4 kW AC
Installed
2016
2016-11-10
Price / watt
$3.75/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | Morrow-Meadows Corp | All their sites → |
| Installer | Morrow-Meadows Corp | All their sites → |
| Utility | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Gloria Solar | GSM6-225D-E1 | 1,120 | 225 W |
| module | Bloom Energy | ES5YA7AA0 | 1 | — |
| inverter | Bloom Energy | INV-571 | 2 | — |
| inverter | Schneider Electric | GT250-480 | 1 | — |
Site risk
Severe-weather exposure
Solar sites in Orange County have been matched to an average of 0 hail and 1 high-wind NOAA storm events.
Regional storm exposure by proximity (417 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_SCE-INT-SCE-68581 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
More solar data for this area
Working with California solar installation records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.