SCE-INT-SCE-66887
Temecula · Riverside County · California · Commercial
System size
212 kW
190.9 kW AC
Installed
2016
2016-10-13
Price / watt
—
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Owner | SolarCity | All their sites → |
| Developer | SolarCity Corporation | All their sites → |
| Installer | SolarCity (Tesla) | All their sites → |
| Utility / operator | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Trina Solar | TSM-310PD14 | 654 | 310.1 W |
| inverter | Solectria Renewables | PVI 23TL-480 | 6 | — |
Site risk
Severe-weather exposure
Solar sites in Riverside County have been matched to an average of 1.2 hail and 3.3 high-wind NOAA storm events.
Regional storm exposure by proximity (12,455 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_SCE-INT-SCE-66887 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.