PanelCensus

SCE-INT-SCE-43522

Earlimart · Tulare County · California · Utility-scale

System size
1,115.1 kW
997.3 kW AC
Installed
2017
2017-07-19
Price / watt
$1.82/W
pre-incentive
Ownership
Host-owned

Parties

Who's involved

RoleName
InstallerJKB EnergyAll their sites →
Utility / operatorSan Diego Gas & Electric Co.All their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
moduleJinko SolarJKM315P-723,480315.5 W
inverterSMA AmericaSTP30000TL-US-10 (480V)2930 kW

Site risk

Severe-weather exposure

Solar sites in Tulare County have been matched to an average of 1 hail and 0 high-wind NOAA storm events.

Regional storm exposure by proximity (448 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Record cadg_SCE-INT-SCE-43522 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

SCE-INT-SCE-43522 — solar installation details | PanelCensus · PanelCensus