SCE-INT-SCE-11530
Bishop · Inyo County · California · Commercial
System size
82.5 kW
73.4 kW AC
Installed
2016
2016-02-19
Price / watt
$2.79/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | Performance Contracting Inc. | All their sites → |
| Installer | Performance Contracting Inc. | All their sites → |
| Utility | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Hanwha Q-Cells | Q.PRO L-G3 310 | 266 | 309.9 W |
| inverter | Solectria Renewables | PVI 23TL-480 | 3 | — |
Site risk
Severe-weather exposure
Solar sites in Inyo County have been matched to an average of 0 hail and 1.9 high-wind NOAA storm events.
Regional storm exposure by proximity (34 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_SCE-INT-SCE-11530 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
More solar data for this area
Working with California solar installation records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.