SCE-INT-SBP-91159
Perris · Riverside County · California · Commercial
System size
177.6 kW
163.2 kW AC
Installed
2025
2025-04-08
Price / watt
$1.75/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | PANELIZED STRUCTURES INC | All their sites → |
| Installer | PANELIZED STRUCTURES INC | All their sites → |
| Utility / operator | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Qcells North America | Q.PEAK DUO L-G8.2 430 | 166 | 429.9 W |
| inverter | SolarEdge Technologies | SE66.6KUS (480V) [SI1] | 1 | 33.3 kW |
| inverter | SolarEdge Technologies | SE100KUS (480V) [SI1] | 1 | 33.3 kW |
Site risk
Severe-weather exposure
Solar sites in Riverside County have been matched to an average of 1.2 hail and 3.3 high-wind NOAA storm events.
Regional storm exposure by proximity (12,455 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_SCE-INT-SBP-91159 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.