PanelCensus

SCE-INT-SBP-52983

Redlands · San Bernardino County · California · Commercial

System size
171 kW
156.1 kW AC
Installed
2025
2025-10-27
Price / watt
—
pre-incentive
Ownership
Host-owned

Parties

Who's involved

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
moduleQcells North AmericaQ.PEAK DUO BLK ML-G10+ 410127409.5 W
inverterSolarEdge TechnologiesSE50KUS (208V) [SI1]216.56 kW

Site risk

Severe-weather exposure

Solar sites in San Bernardino County have been matched to an average of 4.6 hail and 6.2 high-wind NOAA storm events.

Regional storm exposure by proximity (2,271 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Record cadg_SCE-INT-SBP-52983 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

SCE-INT-SBP-52983 — solar installation details | PanelCensus · PanelCensus