PanelCensus

SCE-INT-SBP-52825

Perris · Riverside County · California · Commercial

System size
32.8 kW
30 kW AC
Installed
2025
2025-06-13
Price / watt
$1.95/W
pre-incentive
Ownership
Host-owned

Parties

Who's involved

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
moduleQcells North AmericaQ.PEAK DUO BLK ML-G10+ 40082399.6 W
inverterSolarEdge TechnologiesSE30KUS (480V) [SI1]130.16 kW

Site risk

Severe-weather exposure

Solar sites in Riverside County have been matched to an average of 1.2 hail and 3.3 high-wind NOAA storm events.

Regional storm exposure by proximity (12,455 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Record cadg_SCE-INT-SBP-52825 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Need California solar installation records in bulk? Filtered CSV export from 5,000 rows per download on Pro ($19/mo); Enterprise up to 100,000 rows.

SCE-INT-SBP-52825 — solar installation details | PanelCensus · PanelCensus