SCE-INT-SBP-50119
Perris · Riverside County · California · Commercial
System size
163.5 kW
151.2 kW AC
Installed
2024
2024-11-06
Price / watt
$2.46/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | PANELIZED STRUCTURES INC | All their sites → |
| Installer | PANELIZED STRUCTURES INC | All their sites → |
| Utility / operator | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | JA Solar Holding | JAM72D30-545/MB | 300 | 545.1 W |
| inverter | SolarEdge Technologies | SE120KUS (480V) [SI1] | 1 | 40.25 kW |
Site risk
Severe-weather exposure
Solar sites in Riverside County have been matched to an average of 1.2 hail and 3.3 high-wind NOAA storm events.
Regional storm exposure by proximity (12,455 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_SCE-INT-SBP-50119 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.