SCE-INT-SBP-38186
Perris · Riverside County · California · Commercial
System size
161 kW
153.8 kW AC
Installed
2025
2025-01-13
Price / watt
$2.42/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | PANELIZED STRUCTURES INC | All their sites → |
| Installer | PANELIZED STRUCTURES INC | All their sites → |
| Utility / operator | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | JA Solar Holding | JAM72D30-540/MB | 308 | 539.6 W |
| inverter | Tesla | 1538000-xx-y (240V) - may be a component of Powerwall+ (1850000-XX-Y) [SI1] | 1 | 7.58 kW |
Site risk
Severe-weather exposure
Solar sites in Riverside County have been matched to an average of 1.2 hail and 3.3 high-wind NOAA storm events.
Regional storm exposure by proximity (12,455 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_SCE-INT-SBP-38186 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.