SCE-INT-SBP-20563
Somis · Ventura County · California · Commercial
System size
32.9 kW
29.6 kW AC
Installed
2025
2025-06-23
Price / watt
—
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | CALIFORNIA SOLAR INTEGRATORS INC | All their sites → |
| Installer | CALIFORNIA SOLAR INTEGRATORS INC | All their sites → |
| Utility / operator | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Znshine PV-Tech | ZXM6-NHLDD144-450/M | 73 | 450 W |
| inverter | Yotta Energy | DPI-208 (208V) [SI1] | 19 | 1.73 kW |
Site risk
Severe-weather exposure
Solar sites in Ventura County have been matched to an average of 0 hail and 2.6 high-wind NOAA storm events.
Regional storm exposure by proximity (381 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_SCE-INT-SBP-20563 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Need California solar installation records in bulk? Filtered CSV export from 5,000 rows per download on Pro ($19/mo); Enterprise up to 100,000 rows.