SCE-INT-SBP-116405
Placentia · Orange County · California · Commercial
System size
69.6 kW
64 kW AC
Installed
2025
2025-11-17
Price / watt
$3.95/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | TENCO SOLAR INC | All their sites → |
| Installer | TENCO SOLAR INC | All their sites → |
| Utility | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Philadelphia Solar | PS-MNB144(HCBF)-580W | 120 | 581.2 W |
| module | Sol-Ark | L3 HVR-60KWH-30K | 1 | — |
| inverter | SolarEdge Technologies | SE17.3KUS {208V} [SI1] | 1 | 16.56 kW |
| inverter | SolarEdge Technologies | SE50KUS {208V} [SI1] | 1 | 16.56 kW |
Site risk
Severe-weather exposure
Solar sites in Orange County have been matched to an average of 0 hail and 1 high-wind NOAA storm events.
Regional storm exposure by proximity (417 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_SCE-INT-SBP-116405 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.