SCE-INT-SBP-05640
Woodlake · Tulare County · California · Commercial
System size
47.6 kW
43.5 kW AC
Installed
2024
2024-12-13
Price / watt
$4.17/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | INFINITY ENERGY | All their sites → |
| Installer | INFINITY ENERGY | All their sites → |
| Utility / operator | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Hanwha Q-Cells | Q.PEAK DUO BLK ML-G10+ 400 | 119 | 399.6 W |
| inverter | Ginlong Technologies | Solis-50K-US-F-LSW (480V) [SI1] | 1 | 49.92 kW |
Site risk
Severe-weather exposure
Solar sites in Tulare County have been matched to an average of 1 hail and 0 high-wind NOAA storm events.
Regional storm exposure by proximity (448 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_SCE-INT-SBP-05640 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.