SCE-INT-NST-508136
Paramount · Los Angeles County · California · Commercial
System size
71.7 kW
71.7 kW AC
Installed
2025
2025-04-02
Price / watt
$3.14/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | TURNKEY CONSTRUCTION AND SOLAR INC | All their sites → |
| Installer | TURNKEY CONSTRUCTION AND SOLAR INC | All their sites → |
| Utility / operator | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Hanwha Q-Cells | Q.PEAK DUO XL-G10.3/BFG 480 | 162 | 479.7 W |
| inverter | Chint Power Systems America | CPS SCA60KTL-DO/US-480 (480V) [SI1] | 1 | 60 kW |
Site risk
Severe-weather exposure
Solar sites in Los Angeles County have been matched to an average of 1 hail and 1.9 high-wind NOAA storm events.
Regional storm exposure by proximity (28,422 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_SCE-INT-NST-508136 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Need California solar installation records in bulk? Filtered CSV export from 5,000 rows per download on Pro ($19/mo); Enterprise up to 100,000 rows.