SCE-INT-NST-503120
Fullerton · Orange County · California · Commercial
System size
42.7 kW
42.7 kW AC
Installed
2024
2024-12-24
Price / watt
$4.00/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | BITTEREND VENTURES INC DBA B V I SOLAR | All their sites → |
| Installer | BITTEREND VENTURES INC DBA B V I SOLAR | All their sites → |
| Utility / operator | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | SolarJuice American | S4AI-144B-545C [Clr] | 88 | 545.5 W |
| inverter | Enphase Energy | IQ8H-3P-72-E-US (208V) [SI1] | 88 | 0.38 kW |
Site risk
Severe-weather exposure
Solar sites in Orange County have been matched to an average of 0 hail and 1 high-wind NOAA storm events.
Regional storm exposure by proximity (417 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_SCE-INT-NST-503120 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.