SCE-INT-NST-501332
Menifee · Riverside County · California · Commercial
System size
38.3 kW
34.4 kW AC
Installed
2025
2025-09-09
Price / watt
$33.05/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | CALIFORNIA SOLAR INTEGRATORS INC | All their sites → |
| Installer | CALIFORNIA SOLAR INTEGRATORS INC | All their sites → |
| Utility / operator | SkyHigh 2 Solar | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Vietnam Sunergy | VSUN540-144BMH-DG | 71 | 540.8 W |
| inverter | Altenergy Power System | QT2-208 (208V) [SI1] | 20 | 1.73 kW |
Site risk
Severe-weather exposure
Solar sites in Riverside County have been matched to an average of 1.2 hail and 3.3 high-wind NOAA storm events.
Regional storm exposure by proximity (12,455 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Location: 33.6961, -117.2186 · map
Record cadg_SCE-INT-NST-501332 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Need California solar installation records in bulk? Filtered CSV export from 5,000 rows per download on Pro ($19/mo); Enterprise up to 100,000 rows.