SCE-INT-NST-501202
Westminster · Orange County · California · Commercial
System size
67.9 kW
61.4 kW AC
Installed
2025
2025-09-19
Price / watt
$4.39/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | SUNISTICS | All their sites → |
| Installer | SUNISTICS | All their sites → |
| Utility / operator | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Hanwha Q-Cells | Q.PEAK DUO XL-G10.3/BFG 485 | 140 | 484.7 W |
| inverter | Yaskawa Solectria Solar | PVI 25TL-208 (208V) [SI1] | 2 | 25 kW |
Site risk
Severe-weather exposure
Solar sites in Orange County have been matched to an average of 0 hail and 1 high-wind NOAA storm events.
Regional storm exposure by proximity (417 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_SCE-INT-NST-501202 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Need California solar installation records in bulk? Filtered CSV export from 5,000 rows per download on Pro ($19/mo); Enterprise up to 100,000 rows.