SCE-INT-NST-499024
Garden Grove · Orange County · California · Commercial
System size
179.9 kW
164 kW AC
Installed
2025
2025-07-22
Price / watt
$1.98/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | K12 SOLAR INC | All their sites → |
| Installer | K12 SOLAR INC | All their sites → |
| Utility / operator | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Znshine PV-Tech | ZXM7-SHLDD144-545/M | 330 | 545 W |
| inverter | SolarEdge Technologies | SE50KUS (208V) [SI1] | 3 | 16.56 kW |
Site risk
Severe-weather exposure
Solar sites in Orange County have been matched to an average of 0 hail and 1 high-wind NOAA storm events.
Regional storm exposure by proximity (417 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_SCE-INT-NST-499024 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.