SCE-INT-NST-493603
Porterville · Tulare County · California · Commercial
System size
60.7 kW
54.7 kW AC
Installed
2025
2025-07-17
Price / watt
$3.01/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | AMBROSE SOLAR | All their sites → |
| Installer | AMBROSE SOLAR | All their sites → |
| Utility / operator | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Qcells North America | Q.PEAK DUO BLK ML-G10+ 410 | 148 | 409.5 W |
| inverter | SolarEdge Technologies | SE50KUS (208V) [SI1] | 1 | 16.56 kW |
Site risk
Severe-weather exposure
Solar sites in Tulare County have been matched to an average of 1 hail and 0 high-wind NOAA storm events.
Regional storm exposure by proximity (448 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_SCE-INT-NST-493603 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Need California solar installation records in bulk? Filtered CSV export from 5,000 rows per download on Pro ($19/mo); Enterprise up to 100,000 rows.