PanelCensus

SCE-INT-NST-493565

Rialto · San Bernardino County · California · Commercial

System size
57.3 kW
57.3 kW AC
Installed
2024
2024-10-21
Price / watt
$3.33/W
pre-incentive
Ownership
Host-owned

Parties

Who's involved

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
moduleQcells North AmericaQ.PEAK DUO BLK ML-G10+ 410155409.5 W
inverterSolarEdge TechnologiesSE50KUS (208V) [SI1]116.56 kW

Site risk

Severe-weather exposure

Solar sites in San Bernardino County have been matched to an average of 4.6 hail and 6.2 high-wind NOAA storm events.

Regional storm exposure by proximity (2,271 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Record cadg_SCE-INT-NST-493565 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

SCE-INT-NST-493565 — solar installation details | PanelCensus · PanelCensus