SCE-INT-NST-492082
Lindsay · Tulare County · California · Commercial
System size
75 kW
63.9 kW AC
Installed
2024
2024-10-23
Price / watt
$2.30/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | BARRIER SOLAR INC | All their sites → |
| Installer | BARRIER SOLAR INC | All their sites → |
| Utility / operator | Altus Power America Management, LLC | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | CSI Solar | CS3W-450MS | 158 | 450.5 W |
| inverter | Yaskawa Solectria Solar | PVI 25TL-208 (208V) [SI1] | 3 | 25 kW |
Site risk
Severe-weather exposure
Solar sites in Tulare County have been matched to an average of 1 hail and 0 high-wind NOAA storm events.
Regional storm exposure by proximity (448 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_SCE-INT-NST-492082 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.