PanelCensus

SCE-INT-NST-486094

Moorpark · Ventura County · California · Commercial

System size
60.5 kW
55.3 kW AC
Installed
2025
2025-09-16
Price / watt
$2.47/W
pre-incentive
Ownership
Host-owned

Parties

Who's involved

RoleName
DeveloperPRIORITY TECHNOLOGY SYSTEMS INCAll their sites →
InstallerPRIORITY TECHNOLOGY SYSTEMS INCAll their sites →
UtilityForefront Power, LLCAll their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
moduleJinko SolarJKM550M-72HL4110554.5 W
inverterSMA AmericaSTP 50-US-41 (480V) [SI1]1—

Site risk

Severe-weather exposure

Solar sites in Ventura County have been matched to an average of 0 hail and 2.6 high-wind NOAA storm events.

Regional storm exposure by proximity (381 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Location: 34.3025, -118.8333 · map

Record cadg_SCE-INT-NST-486094 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Working with California solar installation records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

SCE-INT-NST-486094 — solar installation details