SCE-INT-NST-486094
Moorpark · Ventura County · California · Commercial
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | PRIORITY TECHNOLOGY SYSTEMS INC | All their sites → |
| Installer | PRIORITY TECHNOLOGY SYSTEMS INC | All their sites → |
| Utility | Forefront Power, LLC | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Jinko Solar | JKM550M-72HL4 | 110 | 554.5 W |
| inverter | SMA America | STP 50-US-41 (480V) [SI1] | 1 | — |
Site risk
Severe-weather exposure
Solar sites in Ventura County have been matched to an average of 0 hail and 2.6 high-wind NOAA storm events.
Regional storm exposure by proximity (381 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Location: 34.3025, -118.8333 · map
Record cadg_SCE-INT-NST-486094 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.