SCE-INT-NST-485430
Earlimart · Tulare County · California · Commercial
System size
117 kW
107.1 kW AC
Installed
2024
2024-09-03
Price / watt
$1.88/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | RENEWABLE SOLAR | All their sites → |
| Installer | RENEWABLE SOLAR | All their sites → |
| Utility / operator | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | CSI Solar | CS7N-650MB-AG | 180 | 650.4 W |
| inverter | Chint Power Systems America | CPS SCA36KTL-DO/US (480V) [SI1] | 1 | 36 kW |
| inverter | Chint Power Systems America | CPS SCA60KTL-DO/US-480 (480V) [SI1] | 1 | 60 kW |
Site risk
Severe-weather exposure
Solar sites in Tulare County have been matched to an average of 1 hail and 0 high-wind NOAA storm events.
Regional storm exposure by proximity (448 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_SCE-INT-NST-485430 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Need California solar installation records in bulk? Filtered CSV export from 5,000 rows per download on Pro ($19/mo); Enterprise up to 100,000 rows.