SCE-INT-NST-481149
Goleta · Santa Barbara County · California · Commercial
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | FIRST EDISON | All their sites → |
| Installer | FIRST EDISON | All their sites → |
| Utility / operator | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Hanwha Q-Cells | 350W (Model CS3U-350MB-AG) | 99 | — |
| module | Hanwha Q-Cells | Q.PEAK DUO XL-G10.3/BFG 480 | 197 | 479.7 W |
| inverter | SolarEdge Technologies | SE120KUS (480V) [SI1] | 1 | 40.25 kW |
Site risk
Severe-weather exposure
Solar sites in Santa Barbara County have been matched to an average of 0 hail and 1.5 high-wind NOAA storm events.
Regional storm exposure by proximity (196 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_SCE-INT-NST-481149 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.