SCE-INT-NST-480393
Porterville · Tulare County · California · Commercial
System size
69.1 kW
69.1 kW AC
Installed
2025
2025-03-26
Price / watt
$3.62/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | PACIFIC SOLAR | All their sites → |
| Installer | PACIFIC SOLAR | All their sites → |
| Utility / operator | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Hanwha Q-Cells | Q.PEAK DUO XL-G10.2 480 | 194 | 479.8 W |
| inverter | Tigo Energy | TSI-7.6K-US (240V) [SI1] | 2 | 7.52 kW |
| inverter | Tigo Energy | TSI-11.4K-US (240V) [SI1] | 5 | 11.52 kW |
Site risk
Severe-weather exposure
Solar sites in Tulare County have been matched to an average of 1 hail and 0 high-wind NOAA storm events.
Regional storm exposure by proximity (448 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_SCE-INT-NST-480393 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.