SCE-INT-NST-476790
San Bernardino · San Bernardino County · California · Commercial
System size
40.7 kW
36.5 kW AC
Installed
2024
2024-08-22
Price / watt
$3.46/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | TURNKEY CONSTRUCTION AND SOLAR INC | All their sites → |
| Installer | TURNKEY CONSTRUCTION AND SOLAR INC | All their sites → |
| Utility / operator | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Jinko Solar | JKM395M-72HL-TV | 103 | 398.1 W |
| inverter | SMA America | STP 50-US-41 (480V) [SI1] | 1 | — |
Site risk
Severe-weather exposure
Solar sites in San Bernardino County have been matched to an average of 4.6 hail and 6.2 high-wind NOAA storm events.
Regional storm exposure by proximity (2,271 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_SCE-INT-NST-476790 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Need California solar installation records in bulk? Filtered CSV export from 5,000 rows per download on Pro ($19/mo); Enterprise up to 100,000 rows.