SCE-INT-NST-455298
Wasco · Kern County · California · Commercial
System size
351.1 kW
328 kW AC
Installed
2025
2025-08-06
Price / watt
$2.28/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | CALCOM SOLAR | All their sites → |
| Installer | CALCOM SOLAR | All their sites → |
| Utility / operator | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Znshine PV-Tech | ZXM8-TPLDD132-660/M | 532 | 660.3 W |
| inverter | Enphase Energy | IQ7PLUS-72-2-US (240V) [SI1] | 10 | 0.29 kW |
Site risk
Severe-weather exposure
Solar sites in Kern County have been matched to an average of 2.4 hail and 0 high-wind NOAA storm events.
Regional storm exposure by proximity (1,877 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_SCE-INT-NST-455298 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Need California solar installation records in bulk? Filtered CSV export from 5,000 rows per download on Pro ($19/mo); Enterprise up to 100,000 rows.