PanelCensus

SCE-INT-NST-441647

Mojave · Kern County · California · Commercial

System size
139.8 kW
128.7 kW AC
Installed
2024
2024-08-01
Price / watt
—
pre-incentive
Ownership
Host-owned

Parties

Who's involved

RoleName
OwnerBrightSolar CapitalAll their sites →
DeveloperCOLOSSUS ENERGYAll their sites →
InstallerCOLOSSUS ENERGYAll their sites →
Utility / operatorSan Diego Gas & Electric Co.All their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
moduleTrina SolarTSM-590NEG19RC.20237589.9 W
inverterGrowatt New EnergyMIN 11400TL-XH-US (240V) [SI1]711.52 kW

Site risk

Severe-weather exposure

Solar sites in Kern County have been matched to an average of 2.4 hail and 0 high-wind NOAA storm events.

Regional storm exposure by proximity (1,877 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Record cadg_SCE-INT-NST-441647 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

SCE-INT-NST-441647 — solar installation details | PanelCensus · PanelCensus