PanelCensus

SCE-INT-NST-423802

Temecula · Riverside County · California · Commercial

System size
141.6 kW
130.7 kW AC
Installed
2025
2025-07-24
Price / watt
$4.26/W
pre-incentive
Ownership
Host-owned

Parties

Who's involved

RoleName
DeveloperPEACE OF MIND ELECTRICAll their sites →
InstallerPEACE OF MIND ELECTRICAll their sites →
UtilitySan Diego Gas & Electric Co.All their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
moduleHanwha Q-CellsQ.PEAK DUO XL-G10.3/BFG 485157484.7 W
inverterSolarEdge TechnologiesSE30KUS (480V) [SI1]130.16 kW
inverterSolarEdge TechnologiesSE40KUS (480V) [SI1]140.25 kW

Site risk

Severe-weather exposure

Solar sites in Riverside County have been matched to an average of 1.2 hail and 3.3 high-wind NOAA storm events.

Regional storm exposure by proximity (12,455 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Record cadg_SCE-INT-NST-423802 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

More solar data for this area

Working with California solar installation records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

SCE-INT-NST-423802 — solar installation details