SCE-INT-NST-423057
Hanford · Kings County · California · Commercial
System size
40.9 kW
37.6 kW AC
Installed
2024
2024-09-23
Price / watt
$2.59/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | RENEWABLE SOLAR | All their sites → |
| Installer | RENEWABLE SOLAR | All their sites → |
| Utility / operator | Southern California Edison Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | CSI Solar | CS3W-445MB-AG | 92 | 445.4 W |
| inverter | SolarEdge Technologies | SE11400H-US (240V) [SI1] | 3 | 11.39 kW |
Site risk
Severe-weather exposure
Solar sites in Kings County have been matched to an average of 0.8 hail and 1 high-wind NOAA storm events.
Regional storm exposure by proximity (288 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_SCE-INT-NST-423057 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.