PanelCensus

SCE-INT-NST-418118

Apple Valley · San Bernardino County · California · Commercial

System size
71.9 kW
AC nameplate
Installed
2025
2025-02-03
Price / watt
$2.64/W
pre-incentive
Ownership
Host-owned

Parties

Who's involved

RoleName
DeveloperSOLECTRIC SOLUTIONAll their sites →
InstallerSOLECTRIC SOLUTIONAll their sites →
UtilitySan Diego Gas & Electric Co.All their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
moduleHanwha Q-CellsQ.PEAK DUO XL-G10.3/BFG 480165479.7 W
inverterSolarEdge TechnologiesSE43.2KUS (208V) [SI1]214.51 kW

Site risk

Severe-weather exposure

Solar sites in San Bernardino County have been matched to an average of 4.6 hail and 6.2 high-wind NOAA storm events.

Regional storm exposure by proximity (2,271 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Record cadg_SCE-INT-NST-418118 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Working with California solar installation records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

SCE-INT-NST-418118 — solar installation details