SCE-INT-NST-403489
Visalia · Tulare County · California · Commercial
System size
234 kW
213.9 kW AC
Installed
2025
2025-09-09
Price / watt
$2.31/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | RENEWABLE SOLAR | All their sites → |
| Installer | RENEWABLE SOLAR | All their sites → |
| Utility / operator | Southern California Edison Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Chint Power Systems America | CHSM66M(DG)/F-BH-650 | 360 | 650 W |
| inverter | Chint Power Systems America | CPS SCA60KTL-DO/US-480 (480V) [SI1] | 3 | 60 kW |
Site risk
Severe-weather exposure
Solar sites in Tulare County have been matched to an average of 1 hail and 0 high-wind NOAA storm events.
Regional storm exposure by proximity (448 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_SCE-INT-NST-403489 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Need California solar installation records in bulk? Filtered CSV export from 5,000 rows per download on Pro ($19/mo); Enterprise up to 100,000 rows.