SCE-INT-NST-399616
Canyon Lake · Riverside County · California · Commercial
System size
207.5 kW
207.5 kW AC
Installed
2025
2025-04-28
Price / watt
$2.49/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | ALIVE INDUSTRIES INC | All their sites → |
| Installer | ALIVE INDUSTRIES INC | All their sites → |
| Utility / operator | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Aptos Solar Technology | DNA-120-BF10-440W | 260 | 441 W |
| inverter | SolarEdge Technologies | SE80KUS (480V) [SI1] | 2 | 40.25 kW |
Site risk
Severe-weather exposure
Solar sites in Riverside County have been matched to an average of 1.2 hail and 3.3 high-wind NOAA storm events.
Regional storm exposure by proximity (12,455 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_SCE-INT-NST-399616 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Need California solar installation records in bulk? Filtered CSV export from 5,000 rows per download on Pro ($19/mo); Enterprise up to 100,000 rows.