PanelCensus

SCE-INT-NST-344522

Palm Springs · Riverside County · California · Commercial

System size
764.8 kW
764.8 kW AC
Installed
2025
2025-01-06
Price / watt
—
pre-incentive
Ownership
Host-owned

Parties

Who's involved

RoleName
OwnerGREENSKIES CLEAN ENERGY LLCAll their sites →
DeveloperIE CONSTRUCTIONAll their sites →
InstallerIE CONSTRUCTIONAll their sites →
Utility / operatorSan Diego Gas & Electric Co.All their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
modulePhono Solar TechnologyPS385MH-24/TH216385.1 W
moduleCSI SolarCS3U-375MB-AG1,998375.3 W
inverterSolarEdge TechnologiesSE5000H-US (240V) [SI1]15.05 kW

Site risk

Severe-weather exposure

Solar sites in Riverside County have been matched to an average of 1.2 hail and 3.3 high-wind NOAA storm events.

Regional storm exposure by proximity (12,455 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Record cadg_SCE-INT-NST-344522 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

SCE-INT-NST-344522 — solar installation details | PanelCensus · PanelCensus