PanelCensus

SCE-INT-NST-273629

Pixley · Tulare County · California · Commercial

System size
580 kW
536.5 kW AC
Installed
2025
2025-11-12
Price / watt
$2.16/W
pre-incentive
Ownership
Host-owned

Parties

Who's involved

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
moduleZnshine PV-TechZXM7-SHLDD144-540/M1,074540.3 W
inverterChint Power Systems AmericaCPS SCA36KTL-DO/US (480V) [SI1]136 kW
inverterChint Power Systems AmericaCPS SCA60KTL-DO/US-480 (480V) [SI1]660 kW

Site risk

Severe-weather exposure

Solar sites in Tulare County have been matched to an average of 1 hail and 0 high-wind NOAA storm events.

Regional storm exposure by proximity (448 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Location: 35.9593, -119.2933 · map

Record cadg_SCE-INT-NST-273629 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Need California solar installation records in bulk? Filtered CSV export from 5,000 rows per download on Pro ($19/mo); Enterprise up to 100,000 rows.

SCE-INT-NST-273629 — solar installation details | PanelCensus · PanelCensus