SCE-INT-NST-269156
Visalia · Tulare County · California · Commercial
System size
245.7 kW
225.2 kW AC
Installed
2024
2024-01-17
Price / watt
$1.94/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | K12 SOLAR INC | All their sites → |
| Installer | K12 SOLAR INC | All their sites → |
| Utility / operator | Southern California Edison Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Hanwha Q-Cells | Q.PEAK DUO L-G5.2 400 | 406 | 399.8 W |
| inverter | SolarEdge Technologies | SE100KUS (480V) [SI1] | 2 | 33.3 kW |
Site risk
Severe-weather exposure
Solar sites in Tulare County have been matched to an average of 1 hail and 0 high-wind NOAA storm events.
Regional storm exposure by proximity (448 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_SCE-INT-NST-269156 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.