SCE-INT-NST-232550
Lake Forest · Orange County · California · Commercial
System size
60.6 kW
60.6 kW AC
Installed
2025
2025-01-06
Price / watt
$1.81/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | 1ST LIGHT ENERGY INC | All their sites → |
| Installer | 1ST LIGHT ENERGY INC | All their sites → |
| Utility / operator | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Vietnam Sunergy | VSUN400-108BMH | 164 | 400.6 W |
| inverter | Enphase | IQ7-60-2-US (240V) | 38 | 0.24 kW |
Site risk
Severe-weather exposure
Solar sites in Orange County have been matched to an average of 0 hail and 1 high-wind NOAA storm events.
Regional storm exposure by proximity (417 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_SCE-INT-NST-232550 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.