SCE-INT-NST-223453
Palm Desert · Riverside County · California · Utility-scale
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Owner | RCSI | All their sites → |
| Installer | RENEWABLE CONSTRUCTION SERVICES INC | All their sites → |
| Plant operator | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Phono Solar Technology | PS450M4-24/TH | 3,078 | 450 W |
| inverter | Yaskawa Solectria Solar | PVI 50TL-480 (480V) [SI1] | 19 | 50 kW |
Site risk
Severe-weather exposure
Solar sites in Riverside County have been matched to an average of 1.2 hail and 3.3 high-wind NOAA storm events.
Regional storm exposure by proximity (12,455 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_SCE-INT-NST-223453 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
More solar data for this area
Working with California solar installation records? Pro adds alerts, change history and CSV export ($149/mo); Enterprise adds full national files, the API and an MCP server for AI tools.