SCE-INT-NST-221966
Apple Valley · San Bernardino County · California · Commercial
System size
47.6 kW
44.1 kW AC
Installed
2025
2025-10-17
Price / watt
—
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Owner | ForeFront Power LLC | All their sites → |
| Developer | OPTION ONE SOLAR | All their sites → |
| Installer | OPTION ONE SOLAR | All their sites → |
| Utility / operator | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Trina Solar | TSM-400DEG15HC.20(II) | 119 | 400.1 W |
| inverter | SolarEdge Technologies | SE10000H-US (240V) [SI1] | 6 | 9.99 kW |
Site risk
Severe-weather exposure
Solar sites in San Bernardino County have been matched to an average of 4.6 hail and 6.2 high-wind NOAA storm events.
Regional storm exposure by proximity (2,271 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_SCE-INT-NST-221966 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Need California solar installation records in bulk? Filtered CSV export from 5,000 rows per download on Pro ($19/mo); Enterprise up to 100,000 rows.