SCE-INT-NST-155278
Santa Ana · Orange County · California · Commercial
System size
981.3 kW
901.3 kW AC
Installed
2025
2025-08-11
Price / watt
—
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Owner | Main Street Santa Ana Solar Project 2020, LLC | All their sites → |
| Developer | D S D CONSTRUCTION | All their sites → |
| Installer | D S D CONSTRUCTION | All their sites → |
| Utility / operator | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Hanwha Q-Cells | Q.PEAK DUO L-G8.2 430 | 594 | 429.9 W |
| module | Hanwha Q-Cells | Q.PEAK DUO L-G8.2 415 | 1,749 | 415.3 W |
| inverter | Chint Power Systems America | CPS SCA60KTL-DO/US-480 (480V) [SI1] | 12 | 60 kW |
| inverter | Chint Power Systems America | CPS SCA50KTL-DO/US-480 (480V) [SI1] | 18 | 50 kW |
Site risk
Severe-weather exposure
Solar sites in Orange County have been matched to an average of 0 hail and 1 high-wind NOAA storm events.
Regional storm exposure by proximity (417 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_SCE-INT-NST-155278 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.