PanelCensus

SCE-INT-500664902

Porterville · Tulare County · California · Commercial

System size
155.2 kW
152.1 kW AC
Installed
2015
2015-09-01
Price / watt
—
pre-incentive
Ownership
Host-owned

Parties

Who's involved

RoleName
OwnerDom Solar Lessor I LPAll their sites →
DeveloperSolarCity CorporationAll their sites →
InstallerSolarCity (Tesla)All their sites →
Utility / operatorSan Diego Gas & Electric Co.All their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
moduleTrina SolarTSM-305PD14560304.9 W
moduleTeslaStorage 30kW1—
inverterSOLECTRIA RENEWABLESPVI 23TL (-M) (480)1—

Site risk

Severe-weather exposure

Solar sites in Tulare County have been matched to an average of 1 hail and 0 high-wind NOAA storm events.

Regional storm exposure by proximity (448 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Record cadg_SCE-INT-500664902 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

SCE-INT-500664902 — solar installation details | PanelCensus · PanelCensus