PanelCensus

SCE-INT-500664817

Porterville · Tulare County · California · Commercial

System size
88 kW
86.2 kW AC
Installed
2015
2015-09-01
Price / watt
—
pre-incentive
Ownership
Host-owned

Parties

Who's involved

RoleName
OwnerDom Solar Lessor I LPAll their sites →
DeveloperSolarCity CorporationAll their sites →
InstallerSolarCity (Tesla)All their sites →
Utility / operatorSan Diego Gas & Electric Co.All their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
moduleTrina SolarTSM-305PD14312304.9 W
moduleTeslaStorage 30kW1—
inverterSOLECTRIA RENEWABLESPVI 23TL (-M) (480)4—

Site risk

Severe-weather exposure

Solar sites in Tulare County have been matched to an average of 1 hail and 0 high-wind NOAA storm events.

Regional storm exposure by proximity (448 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Record cadg_SCE-INT-500664817 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

SCE-INT-500664817 — solar installation details | PanelCensus · PanelCensus