PanelCensus

SCE-INT-500480232

Palo Verde · Imperial County · California · Commercial

System size
30.4 kW
29.8 kW AC
Installed
2015
2015-06-02
Price / watt
—
pre-incentive
Ownership
Host-owned

Parties

Who's involved

RoleName
DeveloperPLANET SOLAR INCAll their sites →
InstallerPLANET SOLAR INCAll their sites →
Utility / operatorSan Diego Gas & Electric Co.All their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
module——1—
inverterSMA AmericaSTP15000TL-US-10 (480)215 kW

Site risk

Severe-weather exposure

Solar sites in Imperial County have been matched to an average of 0.5 hail and 2.4 high-wind NOAA storm events.

Regional storm exposure by proximity (225 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Record cadg_SCE-INT-500480232 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

SCE-INT-500480232 — solar installation details | PanelCensus · PanelCensus