PanelCensus

SCE-INT-500296691

San Jacinto · Riverside County · California · Commercial

System size
442 kW
433.2 kW AC
Installed
2013
2013-04-04
Price / watt
—
pre-incentive
Ownership
Host-owned

Parties

Who's involved

RoleName
OwnerSequoia Pacific SolarAll their sites →
DeveloperSOLARCITY CORPORATIONAll their sites →
InstallerSolarCity (Tesla)All their sites →
Utility / operatorSan Diego Gas & Electric Co.All their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
moduleBloom EnergyBloom Energy ES-57001—
moduleYingli EnergyYL230P-29b2,184230.1 W
inverterBloom EnergyINV-5701—
inverterSatcon TechnologyPVS-500 (480V)1—

Site risk

Severe-weather exposure

Solar sites in Riverside County have been matched to an average of 1.2 hail and 3.3 high-wind NOAA storm events.

Regional storm exposure by proximity (12,455 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Record cadg_SCE-INT-500296691 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Need California solar installation records in bulk? Filtered CSV export from 5,000 rows per download on Pro ($19/mo); Enterprise up to 100,000 rows.

SCE-INT-500296691 — solar installation details | PanelCensus · PanelCensus